TREE NEWS update: The Jilin Petrochemical–Jilin Oilfield CO2 long-distance pipeline has been completed and put into operation, spanning Jilin, Changchun and Songyuan with a 277.6 km trunk line and annual transport capacity of 3.3 million tonnes. It is China’s longest, largest-diameter, highest-design-pressure and highest-capacity CO2 pipeline, with core equipment including dense-phase injection pumps localized. China has planned or operating more than 120 CCUS demonstration projects, with the oil sector having injected nearly 20 million tonnes of CO2.
China’s longest CO2 pipeline enters operation in Jilin
The significance here lies less in the headline length record than in the localization of dense-phase injection pumps — the kind of equipment detail that signals CCUS moving from demonstration toward industrial supply chains, with the oil sector as anchor offtaker. The scale of planned and operating projects, alongside cumulative injection by the oil industry, suggests CO2 transport is being built as shared infrastructure rather than single-site pilots. Whether pipeline utilization tracks the stated capacity, and whether capture volumes keep pace with transport buildout, is the open question.
Generated by AI for reference only.
Share on WeChat
Open WeChat → Scan → then tap "…" to send to a chat or Moments.
Tap "…" in the top-right corner to send to a chat or share to Moments.