Press Enter to search · ESC to close

AI × Crypto Macro

Global fiber supply gap to hit 180M core-km in 2026, spot prices up 2.8-5x

Global optical fiber supply will fall short of demand by 180 million core-kilometers in 2026, TrendForce estimates, as AI data centers, cross-datacenter interconnects and high-capacity backbone buildouts drive demand. The shortfall is expected to lift spot prices for finished fiber by 2.8 to 5 times year-on-year, prompting telecom vendors to shift from short-term purchases to long-term contracts to lock in supply. TrendForce said global fiber supply has been tight since late 2025 and the strain will likely last until at least 2028.

Original source

AI take

The fiber squeeze is no longer a telecom-capex story but an AI-infrastructure one: the same data-center and interconnect buildout lifting compute demand is now colliding with a physical input that takes years to expand. The shift from spot buying to long-term contracts is the tell — vendors are treating supply security, not price, as the binding constraint, which tends to entrench the shortfall rather than resolve it. The read-across is to any RWA or infrastructure thesis that assumes connectivity costs keep falling. Whether the projected tightness through 2028 holds depends on how much new fiber capacity actually gets financed and commissioned.

Generated by AI for reference only.

Share

Related News

TREE NEWS share card
Long-press image above → Save to Photos / Share
Pitch us Feedback